Namibia vs Sri Lanka: Dealing with construction permits (DB06-15 methodology) - Score

Namibia
74.46
in 2014
Sri Lanka
74.94
in 2014
Namibia rank
45th
Sri Lanka rank
43rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Namibia
  • Sri Lanka
020406080200520092014

How they compare

Sri Lanka currently reports 74.94 against 74.46 in Namibia, a difference of 0.48.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Sri Lanka ahead.

Namibia ranks 45th and Sri Lanka ranks 43rd of 181 countries.

Across the 2 decades both report, Namibia averaged higher in 1 and Sri Lanka in 1.

Head to head by decade

Decade Namibia Sri Lanka Difference Ahead
2000s 67.47 71.61 4.15 Sri Lanka
2010s 73.35 72.81 0.5402 Namibia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Namibia or Sri Lanka?
Sri Lanka, at 74.94 against 74.46 in Namibia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Namibia and Sri Lanka?
0.48, with Sri Lanka ahead.
How many years of comparable data are there for Namibia and Sri Lanka?
10 years are reported by both, from 2005 to 2014.
How do Namibia and Sri Lanka rank globally for dealing with construction permits (db06-15 methodology) - score?
Namibia ranks 45th and Sri Lanka ranks 43rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.