Namibia vs Yemen, Rep.: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Namibia
- Yemen, Rep.
How they compare
Yemen, Rep. currently reports 75.4 against 74.46 in Namibia, a difference of 0.94.
Across all 10 years both countries report, Yemen, Rep. has been ahead every year.
Namibia ranks 45th and Yemen, Rep. ranks 42nd of 181 countries.
Yemen, Rep. has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Namibia | Yemen, Rep. | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 67.47 | 81.07 | 13.6 | Yemen, Rep. |
| 2010s | 73.35 | 78.03 | 4.67 | Yemen, Rep. |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Namibia or Yemen, Rep.?
- Yemen, Rep., at 75.4 against 74.46 in Namibia as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Namibia and Yemen, Rep.?
- 0.94, with Yemen, Rep. ahead.
- How many years of comparable data are there for Namibia and Yemen, Rep.?
- 10 years are reported by both, from 2005 to 2014.
- How do Namibia and Yemen, Rep. rank globally for dealing with construction permits (db06-15 methodology) - score?
- Namibia ranks 45th and Yemen, Rep. ranks 42nd of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.