Nicaragua vs Senegal: Dealing with construction permits (DB06-15 methodology) - Score

Nicaragua
52.4
in 2014
Senegal
51.96
in 2014
Nicaragua rank
140th
Senegal rank
142nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Nicaragua
  • Senegal
0204060200520092014

How they compare

Nicaragua currently reports 52.4 against 51.96 in Senegal, a difference of 0.44.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Senegal ahead.

Nicaragua ranks 140th and Senegal ranks 142nd of 181 countries.

Senegal has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Nicaragua Senegal Difference Ahead
2000s 44.82 60.92 16.1 Senegal
2010s 48.2 51.61 3.41 Senegal

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Nicaragua or Senegal?
Nicaragua, at 52.4 against 51.96 in Senegal as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Nicaragua and Senegal?
0.44, with Nicaragua ahead.
How many years of comparable data are there for Nicaragua and Senegal?
10 years are reported by both, from 2005 to 2014.
How do Nicaragua and Senegal rank globally for dealing with construction permits (db06-15 methodology) - score?
Nicaragua ranks 140th and Senegal ranks 142nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.