Oman vs Saudi Arabia: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Oman
- Saudi Arabia
How they compare
Saudi Arabia currently reports 76.41 against 76.3 in Oman, a difference of 0.11.
The two have swapped places 3 times across 10 shared years of data; in 2005 it was Oman ahead.
Oman ranks 34th and Saudi Arabia ranks 33rd of 181 countries.
Across the 2 decades both report, Oman averaged higher in 1 and Saudi Arabia in 1.
Head to head by decade
| Decade | Oman | Saudi Arabia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 73.89 | 68.78 | 5.1 | Oman |
| 2010s | 75.92 | 76.07 | 0.1499 | Saudi Arabia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Oman or Saudi Arabia?
- Saudi Arabia, at 76.41 against 76.3 in Oman as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Oman and Saudi Arabia?
- 0.11, with Saudi Arabia ahead.
- How many years of comparable data are there for Oman and Saudi Arabia?
- 10 years are reported by both, from 2005 to 2014.
- How do Oman and Saudi Arabia rank globally for dealing with construction permits (db06-15 methodology) - score?
- Oman ranks 34th and Saudi Arabia ranks 33rd of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.