Philippines vs Slovakia: Dealing with construction permits (DB06-15 methodology) - Score

Philippines
61.6
in 2014
Slovakia
61.3
in 2014
Philippines rank
118th
Slovakia rank
119th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Philippines
  • Slovakia
0204060200520092014

How they compare

Philippines currently reports 61.6 against 61.3 in Slovakia, a difference of 0.3.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Slovakia ahead.

Philippines ranks 118th and Slovakia ranks 119th of 181 countries.

Slovakia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Philippines Slovakia Difference Ahead
2000s 51.75 61.24 9.49 Slovakia
2010s 56.25 61.42 5.17 Slovakia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Philippines or Slovakia?
Philippines, at 61.6 against 61.3 in Slovakia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Philippines and Slovakia?
0.3, with Philippines ahead.
How many years of comparable data are there for Philippines and Slovakia?
10 years are reported by both, from 2005 to 2014.
How do Philippines and Slovakia rank globally for dealing with construction permits (db06-15 methodology) - score?
Philippines ranks 118th and Slovakia ranks 119th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.