Puerto Rico vs Senegal: Dealing with construction permits (DB06-15 methodology) - Score

Puerto Rico
52.56
in 2014
Senegal
51.96
in 2014
Puerto Rico rank
139th
Senegal rank
142nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Puerto Rico
  • Senegal
0204060200520092014

How they compare

Puerto Rico currently reports 52.56 against 51.96 in Senegal, a difference of 0.6.

The two have swapped places 3 times across 10 shared years of data; in 2005 it was Senegal ahead.

Puerto Rico ranks 139th and Senegal ranks 142nd of 181 countries.

Across the 2 decades both report, Puerto Rico averaged higher in 1 and Senegal in 1.

Head to head by decade

Decade Puerto Rico Senegal Difference Ahead
2000s 57.52 60.92 3.4 Senegal
2010s 51.98 51.61 0.368 Puerto Rico

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Puerto Rico or Senegal?
Puerto Rico, at 52.56 against 51.96 in Senegal as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Puerto Rico and Senegal?
0.6, with Puerto Rico ahead.
How many years of comparable data are there for Puerto Rico and Senegal?
10 years are reported by both, from 2005 to 2014.
How do Puerto Rico and Senegal rank globally for dealing with construction permits (db06-15 methodology) - score?
Puerto Rico ranks 139th and Senegal ranks 142nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.