Puerto Rico vs Tajikistan: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Puerto Rico
- Tajikistan
How they compare
Puerto Rico currently reports 52.56 against 52.3 in Tajikistan, a difference of 0.26.
Across all 10 years both countries report, Puerto Rico has been ahead every year.
Puerto Rico ranks 140th and Tajikistan ranks 142nd of 183 countries.
Puerto Rico has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Puerto Rico | Tajikistan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 57.52 | 24.23 | 33.28 | Puerto Rico |
| 2010s | 51.98 | 48.06 | 3.92 | Puerto Rico |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Puerto Rico or Tajikistan?
- Puerto Rico, at 52.56 against 52.3 in Tajikistan as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Puerto Rico and Tajikistan?
- 0.26, with Puerto Rico ahead.
- How many years of comparable data are there for Puerto Rico and Tajikistan?
- 10 years are reported by both, from 2005 to 2014.
- How do Puerto Rico and Tajikistan rank globally for dealing with construction permits (db06-15 methodology) - score?
- Puerto Rico ranks 140th and Tajikistan ranks 142nd of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.