Saudi Arabia vs Saint Lucia: Dealing with construction permits (DB06-15 methodology) - Score

Saudi Arabia
76.41
in 2014
Saint Lucia
78.21
in 2014
Saudi Arabia rank
33rd
Saint Lucia rank
30th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Saudi Arabia
  • Saint Lucia
020406080200520092014

How they compare

Saint Lucia currently reports 78.21 against 76.41 in Saudi Arabia, a difference of 1.8.

Across all 10 years both countries report, Saint Lucia has been ahead every year.

Saudi Arabia ranks 33rd and Saint Lucia ranks 30th of 181 countries.

Saint Lucia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Saudi Arabia Saint Lucia Difference Ahead
2000s 68.78 75.91 7.12 Saint Lucia
2010s 76.07 78.03 1.96 Saint Lucia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Saudi Arabia or Saint Lucia?
Saint Lucia, at 78.21 against 76.41 in Saudi Arabia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Saudi Arabia and Saint Lucia?
1.8, with Saint Lucia ahead.
How many years of comparable data are there for Saudi Arabia and Saint Lucia?
10 years are reported by both, from 2005 to 2014.
How do Saudi Arabia and Saint Lucia rank globally for dealing with construction permits (db06-15 methodology) - score?
Saudi Arabia ranks 33rd and Saint Lucia ranks 30th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.