Serbia vs Zimbabwe: Dealing with construction permits (DB06-15 methodology) - Score

Serbia
21.19
in 2014
Zimbabwe
26.67
in 2014
Serbia rank
179th
Zimbabwe rank
177th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Serbia
  • Zimbabwe
203040506070200520092014

How they compare

Zimbabwe currently reports 26.67 against 21.19 in Serbia, a difference of 5.48.

That makes Zimbabwe's figure about 1.3 times Serbia's.

Across all 10 years both countries report, Zimbabwe has been ahead every year.

Serbia ranks 179th and Zimbabwe ranks 177th of 181 countries.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Serbia Zimbabwe Difference Ahead
2000s 23.3 54.75 31.45 Zimbabwe
2010s 20.27 31.26 10.99 Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Serbia or Zimbabwe?
Zimbabwe, at 26.67 against 21.19 in Serbia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Serbia and Zimbabwe?
5.48, with Zimbabwe ahead.
How many years of comparable data are there for Serbia and Zimbabwe?
10 years are reported by both, from 2005 to 2014.
How do Serbia and Zimbabwe rank globally for dealing with construction permits (db06-15 methodology) - score?
Serbia ranks 179th and Zimbabwe ranks 177th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.