Sierra Leone vs Tanzania: Dealing with construction permits (DB06-15 methodology) - Score

Sierra Leone
40.64
in 2014
Tanzania
38.01
in 2014
Sierra Leone rank
163rd
Tanzania rank
166th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Sierra Leone
  • Tanzania
10203040200520092014

How they compare

Sierra Leone currently reports 40.64 against 38.01 in Tanzania, a difference of 2.63.

That makes Sierra Leone's figure about 1.1 times Tanzania's.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Tanzania ahead.

Sierra Leone ranks 163rd and Tanzania ranks 166th of 181 countries.

Tanzania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sierra Leone Tanzania Difference Ahead
2000s 21.75 33.52 11.77 Tanzania
2010s 36.41 40.05 3.64 Tanzania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Sierra Leone or Tanzania?
Sierra Leone, at 40.64 against 38.01 in Tanzania as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Sierra Leone and Tanzania?
2.63, with Sierra Leone ahead.
How many years of comparable data are there for Sierra Leone and Tanzania?
10 years are reported by both, from 2005 to 2014.
How do Sierra Leone and Tanzania rank globally for dealing with construction permits (db06-15 methodology) - score?
Sierra Leone ranks 163rd and Tanzania ranks 166th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.