Singapore vs Saint Vincent and the Grenadines: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Singapore
- Saint Vincent and the Grenadines
How they compare
Saint Vincent and the Grenadines currently reports 81.43 against 80.9 in Singapore, a difference of 0.53.
The two have swapped places 2 times across 10 shared years of data; in 2005 it was Saint Vincent and the Grenadines ahead.
Singapore ranks 22nd and Saint Vincent and the Grenadines ranks 19th of 183 countries.
Saint Vincent and the Grenadines has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Singapore | Saint Vincent and the Grenadines | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 81.05 | 89.63 | 8.58 | Saint Vincent and the Grenadines |
| 2010s | 82.44 | 84.74 | 2.3 | Saint Vincent and the Grenadines |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Singapore or Saint Vincent and the Grenadines?
- Saint Vincent and the Grenadines, at 81.43 against 80.9 in Singapore as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Singapore and Saint Vincent and the Grenadines?
- 0.53, with Saint Vincent and the Grenadines ahead.
- How many years of comparable data are there for Singapore and Saint Vincent and the Grenadines?
- 10 years are reported by both, from 2005 to 2014.
- How do Singapore and Saint Vincent and the Grenadines rank globally for dealing with construction permits (db06-15 methodology) - score?
- Singapore ranks 22nd and Saint Vincent and the Grenadines ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.