Solomon Islands vs Togo: Dealing with construction permits (DB06-15 methodology) - Score

Solomon Islands
47.65
in 2014
Togo
47.39
in 2014
Solomon Islands rank
152nd
Togo rank
154th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Solomon Islands
  • Togo
01020304050200520092014

How they compare

Solomon Islands currently reports 47.65 against 47.39 in Togo, a difference of 0.26.

Across all 10 years both countries report, Solomon Islands has been ahead every year.

Solomon Islands ranks 152nd and Togo ranks 154th of 181 countries.

Solomon Islands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Solomon Islands Togo Difference Ahead
2000s 47.65 29.1 18.55 Solomon Islands
2010s 47.65 35.48 12.17 Solomon Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Solomon Islands or Togo?
Solomon Islands, at 47.65 against 47.39 in Togo as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Solomon Islands and Togo?
0.26, with Solomon Islands ahead.
How many years of comparable data are there for Solomon Islands and Togo?
10 years are reported by both, from 2005 to 2014.
How do Solomon Islands and Togo rank globally for dealing with construction permits (db06-15 methodology) - score?
Solomon Islands ranks 152nd and Togo ranks 154th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.