Spain vs Timor-Leste: Dealing with construction permits (DB06-15 methodology) - Score

Spain
68.32
in 2014
Timor-Leste
67.52
in 2014
Spain rank
81st
Timor-Leste rank
83rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Spain
  • Timor-Leste
0204060200520092014

How they compare

Spain currently reports 68.32 against 67.52 in Timor-Leste, a difference of 0.8.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Spain ahead.

Spain ranks 81st and Timor-Leste ranks 83rd of 181 countries.

Timor-Leste has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Spain Timor-Leste Difference Ahead
2000s 63.83 66.06 2.23 Timor-Leste
2010s 65.17 67.39 2.22 Timor-Leste

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Spain or Timor-Leste?
Spain, at 68.32 against 67.52 in Timor-Leste as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Spain and Timor-Leste?
0.8, with Spain ahead.
How many years of comparable data are there for Spain and Timor-Leste?
10 years are reported by both, from 2005 to 2014.
How do Spain and Timor-Leste rank globally for dealing with construction permits (db06-15 methodology) - score?
Spain ranks 81st and Timor-Leste ranks 83rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.