Sri Lanka vs Switzerland: Dealing with construction permits (DB06-15 methodology) - Score

Sri Lanka
74.94
in 2014
Switzerland
75.65
in 2014
Sri Lanka rank
43rd
Switzerland rank
40th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Sri Lanka
  • Switzerland
020406080200520092014

How they compare

Switzerland currently reports 75.65 against 74.94 in Sri Lanka, a difference of 0.71.

Across all 10 years both countries report, Switzerland has been ahead every year.

Sri Lanka ranks 43rd and Switzerland ranks 40th of 181 countries.

Switzerland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sri Lanka Switzerland Difference Ahead
2000s 71.61 74.16 2.54 Switzerland
2010s 72.81 75.07 2.26 Switzerland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Sri Lanka or Switzerland?
Switzerland, at 75.65 against 74.94 in Sri Lanka as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Sri Lanka and Switzerland?
0.71, with Switzerland ahead.
How many years of comparable data are there for Sri Lanka and Switzerland?
10 years are reported by both, from 2005 to 2014.
How do Sri Lanka and Switzerland rank globally for dealing with construction permits (db06-15 methodology) - score?
Sri Lanka ranks 43rd and Switzerland ranks 40th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.