Saint Lucia vs United States: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Saint Lucia
- United States
How they compare
United States currently reports 78.69 against 78.21 in Saint Lucia, a difference of 0.48.
Across all 10 years both countries report, United States has been ahead every year.
Saint Lucia ranks 30th and United States ranks 27th of 183 countries.
United States has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Saint Lucia | United States | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 75.91 | 84.38 | 8.47 | United States |
| 2010s | 78.03 | 79.48 | 1.44 | United States |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Saint Lucia or United States?
- United States, at 78.69 against 78.21 in Saint Lucia as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Saint Lucia and United States?
- 0.48, with United States ahead.
- How many years of comparable data are there for Saint Lucia and United States?
- 10 years are reported by both, from 2005 to 2014.
- How do Saint Lucia and United States rank globally for dealing with construction permits (db06-15 methodology) - score?
- Saint Lucia ranks 30th and United States ranks 27th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.