Albania vs Peru: Dealing with construction permits: Procedures

Albania
19 number
in 2019
Peru
19 number
in 2019
Albania rank
24th
Peru rank
24th

Dealing with construction permits: Procedures over time

  • Albania
  • Peru
0510152025200520122019

How they compare

Albania currently reports 19 number against 19 number in Peru, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2005 it was Albania ahead.

Albania ranks 24th and Peru ranks 24th of 185 countries.

Albania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Albania Peru Difference Ahead
2000s 24 number 19 number 5 number Albania
2010s 20.33 number 19.33 number 1 number Albania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: procedures, Albania or Peru?
Albania, at 19 number against 19 number in Peru as of 2019.
What is the difference in dealing with construction permits: procedures between Albania and Peru?
0 number, with Albania ahead.
How many years of comparable data are there for Albania and Peru?
11 years are reported by both, from 2005 to 2019.
How do Albania and Peru rank globally for dealing with construction permits: procedures?
Albania ranks 24th and Peru ranks 24th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.