Brunei vs Palau: Dealing with construction permits: Procedures (number) (Dealing)

Brunei
20 number
in 2019
Palau
20 number
in 2019
Brunei rank
15th
Palau rank
15th

Dealing with construction permits: Procedures (number) (Dealing) over time

  • Brunei
  • Palau
0510152025200520122019

How they compare

Brunei currently reports 20 number against 20 number in Palau, a difference of 0 number.

The two have swapped places 3 times across 14 shared years of data; in 2006 it was Brunei ahead.

Brunei ranks 15th and Palau ranks 15th of 188 countries.

Brunei has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei Palau Difference Ahead
2000s 21.5 number 20 number 1.5 number Brunei
2010s 20.3 number 20 number 0.3 number Brunei

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: procedures, Brunei or Palau?
Brunei, at 20 number against 20 number in Palau as of 2019.
What is the difference in dealing with construction permits: procedures between Brunei and Palau?
0 number, with Brunei ahead.
How many years of comparable data are there for Brunei and Palau?
14 years are reported by both, from 2006 to 2019.
How do Brunei and Palau rank globally for dealing with construction permits: procedures?
Brunei ranks 15th and Palau ranks 15th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei vs Palau: Dealing with construction permits: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-procedures-number/brunei-darussalam/palau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-procedures-number/brunei-darussalam/palau/">Brunei vs Palau: Dealing with construction permits: Procedures</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.