Laos vs Nepal: Dealing with construction permits: Procedures

Laos
12 number
in 2019
Nepal
12 number
in 2019
Laos rank
131st
Nepal rank
131st

Dealing with construction permits: Procedures over time

  • Laos
  • Nepal
02.557.51012.5200520122019

How they compare

Laos currently reports 12 number against 12 number in Nepal, a difference of 0 number.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Nepal ahead.

Laos ranks 131st and Nepal ranks 131st of 185 countries.

Laos has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Laos Nepal Difference Ahead
2000s 11 number 11 number 0 number
2010s 11.7 number 11.6 number 0.1 number Laos

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: procedures, Laos or Nepal?
Laos, at 12 number against 12 number in Nepal as of 2019.
What is the difference in dealing with construction permits: procedures between Laos and Nepal?
0 number, with Laos ahead.
How many years of comparable data are there for Laos and Nepal?
15 years are reported by both, from 2005 to 2019.
How do Laos and Nepal rank globally for dealing with construction permits: procedures?
Laos ranks 131st and Nepal ranks 131st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.