North Macedonia vs Singapore: Dealing with construction permits: Procedures
Dealing with construction permits: Procedures over time
- North Macedonia
- Singapore
How they compare
North Macedonia currently reports 9 number against 9 number in Singapore, a difference of 0 number.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was North Macedonia ahead.
North Macedonia ranks 172nd and Singapore ranks 172nd of 185 countries.
Across the 2 decades both report, North Macedonia averaged higher in 1 and Singapore in 1.
Head to head by decade
| Decade | North Macedonia | Singapore | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 20 number | 13 number | 7 number | North Macedonia |
| 2010s | 10.1 number | 11.9 number | 1.8 number | Singapore |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: procedures, North Macedonia or Singapore?
- North Macedonia, at 9 number against 9 number in Singapore as of 2019.
- What is the difference in dealing with construction permits: procedures between North Macedonia and Singapore?
- 0 number, with North Macedonia ahead.
- How many years of comparable data are there for North Macedonia and Singapore?
- 15 years are reported by both, from 2005 to 2019.
- How do North Macedonia and Singapore rank globally for dealing with construction permits: procedures?
- North Macedonia ranks 172nd and Singapore ranks 172nd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.