Zambia vs Zimbabwe: Dealing with construction permits: Procedures

Zambia
10 number
in 2019
Zimbabwe
10 number
in 2019
Zambia rank
160th
Zimbabwe rank
160th

Dealing with construction permits: Procedures over time

  • Zambia
  • Zimbabwe
02.557.510200520122019

How they compare

Zambia currently reports 10 number against 10 number in Zimbabwe, a difference of 0 number.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Zambia ahead.

Zambia ranks 160th and Zimbabwe ranks 160th of 185 countries.

Zambia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Zambia Zimbabwe Difference Ahead
2000s 11 number 10 number 1 number Zambia
2010s 10.1 number 10 number 0.1 number Zambia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: procedures, Zambia or Zimbabwe?
Zambia, at 10 number against 10 number in Zimbabwe as of 2019.
What is the difference in dealing with construction permits: procedures between Zambia and Zimbabwe?
0 number, with Zambia ahead.
How many years of comparable data are there for Zambia and Zimbabwe?
15 years are reported by both, from 2005 to 2019.
How do Zambia and Zimbabwe rank globally for dealing with construction permits: procedures?
Zambia ranks 160th and Zimbabwe ranks 160th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The number of procedures records all interactions of the building company’s employees or any party acting on its behalf with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies and public inspectors. Procedures that the company undergoes to connect the warehouse to water and sewerage are included. All procedures that are legally required and that are done in practice by a majority of companies are counted, even if they may be avoided in exceptional cases.