North Macedonia vs Russian Federation: Dealing with construction permits: Professional certifications index
Dealing with construction permits: Professional certifications index over time
- North Macedonia
- Russian Federation
How they compare
North Macedonia currently reports 4 DB16-20 methodology against 4 DB16-20 methodology in Russian Federation, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Russian Federation has been ahead every year.
North Macedonia ranks 1st and Russian Federation ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: professional certifications index, North Macedonia or Russian Federation?
- North Macedonia, at 4 DB16-20 methodology against 4 DB16-20 methodology in Russian Federation as of 2019.
- What is the difference in dealing with construction permits: professional certifications index between North Macedonia and Russian Federation?
- 0 DB16-20 methodology, with North Macedonia ahead.
- How many years of comparable data are there for North Macedonia and Russian Federation?
- 6 years are reported by both, from 2014 to 2019.
- How do North Macedonia and Russian Federation rank globally for dealing with construction permits: professional certifications index?
- North Macedonia ranks 1st and Russian Federation ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Professional certifications index (0-4) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The professional certifications index evaluates professional certi?cation requirements. It has two components: (i) the qualification requirements of the professional responsible for verifying that the architectural plans or drawings are in compliance with the building regulations; and (ii) the qualification requirements of the professional who conducts the technical inspections during construction. The index is computed based on the methodology in the DB16-20 studies.