Angola vs Cameroon: Dealing with construction permits: Quality control after construction

Angola
2 DB16-20 methodology
in 2019
Cameroon
2 DB16-20 methodology
in 2019
Angola rank
134th
Cameroon rank
134th

Dealing with construction permits: Quality control after construction over time

  • Angola
  • Cameroon
00.511.52201420162019

How they compare

Angola currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Cameroon, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Cameroon has been ahead every year.

Angola ranks 134th and Cameroon ranks 134th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Angola or Cameroon?
Angola, at 2 DB16-20 methodology against 2 DB16-20 methodology in Cameroon as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Angola and Cameroon?
0 DB16-20 methodology, with Angola ahead.
How many years of comparable data are there for Angola and Cameroon?
6 years are reported by both, from 2014 to 2019.
How do Angola and Cameroon rank globally for dealing with construction permits: quality control after construction?
Angola ranks 134th and Cameroon ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Angola vs Cameroon: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/angola/cameroon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/angola/cameroon/">Angola vs Cameroon: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.