Australia vs Chad: Dealing with construction permits: Quality control after construction
Australia
3 DB16-20 methodology
in 2019
Chad
3 DB16-20 methodology
in 2019
Australia rank
1st
Chad rank
1st
Dealing with construction permits: Quality control after construction over time
- Australia
- Chad
How they compare
Australia currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Chad, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Chad has been ahead every year.
Australia ranks 1st and Chad ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Australia or Chad?
- Australia, at 3 DB16-20 methodology against 3 DB16-20 methodology in Chad as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Australia and Chad?
- 0 DB16-20 methodology, with Australia ahead.
- How many years of comparable data are there for Australia and Chad?
- 6 years are reported by both, from 2014 to 2019.
- How do Australia and Chad rank globally for dealing with construction permits: quality control after construction?
- Australia ranks 1st and Chad ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.