Belarus vs Cape Verde: Dealing with construction: Quality control after

Belarus
3 DB16-20 methodology
in 2019
Cape Verde
3 DB16-20 methodology
in 2019
Belarus rank
1st
Cape Verde rank
1st

Dealing with construction: Quality control after over time

  • Belarus
  • Cape Verde
0123201420162019

How they compare

Belarus currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Cape Verde, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Cape Verde has been ahead every year.

Belarus ranks 1st and Cape Verde ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Belarus or Cape Verde?
Belarus, at 3 DB16-20 methodology against 3 DB16-20 methodology in Cape Verde as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Belarus and Cape Verde?
0 DB16-20 methodology, with Belarus ahead.
How many years of comparable data are there for Belarus and Cape Verde?
6 years are reported by both, from 2014 to 2019.
How do Belarus and Cape Verde rank globally for dealing with construction permits: quality control after construction?
Belarus ranks 1st and Cape Verde ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belarus vs Cape Verde: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/belarus/cabo-verde/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/belarus/cabo-verde/">Belarus vs Cape Verde: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.