Belarus, Republic of vs Colombia: Dealing with construction permits: Quality control after construction
Belarus, Republic of
3 DB16-20 methodology
in 2019
Colombia
3 DB16-20 methodology
in 2019
Belarus, Republic of rank
1st
Colombia rank
1st
Dealing with construction permits: Quality control after construction over time
- Belarus, Republic of
- Colombia
How they compare
Belarus, Republic of currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Colombia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Colombia has been ahead every year.
Belarus, Republic of ranks 1st and Colombia ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Belarus, Republic of or Colombia?
- Belarus, Republic of, at 3 DB16-20 methodology against 3 DB16-20 methodology in Colombia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Belarus, Republic of and Colombia?
- 0 DB16-20 methodology, with Belarus, Republic of ahead.
- How many years of comparable data are there for Belarus, Republic of and Colombia?
- 6 years are reported by both, from 2014 to 2019.
- How do Belarus, Republic of and Colombia rank globally for dealing with construction permits: quality control after construction?
- Belarus, Republic of ranks 1st and Colombia ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.