Belarus, Republic of vs Netherlands, The: Dealing with construction permits: Quality control after construction
Belarus, Republic of
3 DB16-20 methodology
in 2019
Netherlands, The
3 DB16-20 methodology
in 2019
Belarus, Republic of rank
1st
Netherlands, The rank
1st
Dealing with construction permits: Quality control after construction over time
- Belarus, Republic of
- Netherlands, The
How they compare
Belarus, Republic of currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Netherlands, The, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Netherlands, The has been ahead every year.
Belarus, Republic of ranks 1st and Netherlands, The ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Belarus, Republic of or Netherlands, The?
- Belarus, Republic of, at 3 DB16-20 methodology against 3 DB16-20 methodology in Netherlands, The as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Belarus, Republic of and Netherlands, The?
- 0 DB16-20 methodology, with Belarus, Republic of ahead.
- How many years of comparable data are there for Belarus, Republic of and Netherlands, The?
- 6 years are reported by both, from 2014 to 2019.
- How do Belarus, Republic of and Netherlands, The rank globally for dealing with construction permits: quality control after construction?
- Belarus, Republic of ranks 1st and Netherlands, The ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.