Belize vs Denmark: Dealing with construction permits: Quality control after construction

Belize
3 DB16-20 methodology
in 2019
Denmark
3 DB16-20 methodology
in 2019
Belize rank
1st
Denmark rank
1st

Dealing with construction permits: Quality control after construction over time

  • Belize
  • Denmark
0123201420162019

How they compare

Belize currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Denmark, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Denmark has been ahead every year.

Belize ranks 1st and Denmark ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Belize or Denmark?
Belize, at 3 DB16-20 methodology against 3 DB16-20 methodology in Denmark as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Belize and Denmark?
0 DB16-20 methodology, with Belize ahead.
How many years of comparable data are there for Belize and Denmark?
6 years are reported by both, from 2014 to 2019.
How do Belize and Denmark rank globally for dealing with construction permits: quality control after construction?
Belize ranks 1st and Denmark ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.