Belize vs Japan: Dealing with construction permits: Quality control after construction
Belize
3 DB16-20 methodology
in 2019
Japan
3 DB16-20 methodology
in 2019
Belize rank
1st
Japan rank
1st
Dealing with construction permits: Quality control after construction over time
- Belize
- Japan
How they compare
Belize currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Japan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Japan has been ahead every year.
Belize ranks 1st and Japan ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Belize or Japan?
- Belize, at 3 DB16-20 methodology against 3 DB16-20 methodology in Japan as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Belize and Japan?
- 0 DB16-20 methodology, with Belize ahead.
- How many years of comparable data are there for Belize and Japan?
- 6 years are reported by both, from 2014 to 2019.
- How do Belize and Japan rank globally for dealing with construction permits: quality control after construction?
- Belize ranks 1st and Japan ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.