Benin vs Central African Republic: Dealing with construction permits: Quality control after construction

Benin
2 DB16-20 methodology
in 2019
Central African Republic
2 DB16-20 methodology
in 2019
Benin rank
135th
Central African Republic rank
135th

Dealing with construction permits: Quality control after construction over time

  • Benin
  • Central African Republic
00.511.52201420162019

How they compare

Benin currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Central African Republic, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Central African Republic has been ahead every year.

Benin ranks 135th and Central African Republic ranks 135th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Benin or Central African Republic?
Benin, at 2 DB16-20 methodology against 2 DB16-20 methodology in Central African Republic as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Benin and Central African Republic?
0 DB16-20 methodology, with Benin ahead.
How many years of comparable data are there for Benin and Central African Republic?
6 years are reported by both, from 2014 to 2019.
How do Benin and Central African Republic rank globally for dealing with construction permits: quality control after construction?
Benin ranks 135th and Central African Republic ranks 135th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Benin vs Central African Republic: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/benin/central-african-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/benin/central-african-republic/">Benin vs Central African Republic: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.