Benin vs Comoros: Dealing with construction permits: Quality control after construction
Benin
2 DB16-20 methodology
in 2019
Comoros
2 DB16-20 methodology
in 2019
Benin rank
132nd
Comoros rank
132nd
Dealing with construction permits: Quality control after construction over time
- Benin
- Comoros
How they compare
Benin currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Comoros, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Comoros has been ahead every year.
Benin ranks 132nd and Comoros ranks 132nd of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Benin or Comoros?
- Benin, at 2 DB16-20 methodology against 2 DB16-20 methodology in Comoros as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Benin and Comoros?
- 0 DB16-20 methodology, with Benin ahead.
- How many years of comparable data are there for Benin and Comoros?
- 6 years are reported by both, from 2014 to 2019.
- How do Benin and Comoros rank globally for dealing with construction permits: quality control after construction?
- Benin ranks 132nd and Comoros ranks 132nd of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.