Benin vs Congo: Dealing with construction permits: Quality control after construction
Benin
2 DB16-20 methodology
in 2019
Congo
2 DB16-20 methodology
in 2019
Benin rank
132nd
Congo rank
132nd
Dealing with construction permits: Quality control after construction over time
- Benin
- Congo
How they compare
Benin currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Congo, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Congo has been ahead every year.
Benin ranks 132nd and Congo ranks 132nd of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Benin or Congo?
- Benin, at 2 DB16-20 methodology against 2 DB16-20 methodology in Congo as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Benin and Congo?
- 0 DB16-20 methodology, with Benin ahead.
- How many years of comparable data are there for Benin and Congo?
- 6 years are reported by both, from 2014 to 2019.
- How do Benin and Congo rank globally for dealing with construction permits: quality control after construction?
- Benin ranks 132nd and Congo ranks 132nd of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.