Bolivia, Plurinational State of vs Saint Vincent and the Grenadines: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Bolivia, Plurinational State of
- Saint Vincent and the Grenadines
How they compare
Bolivia, Plurinational State of currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Saint Vincent and the Grenadines, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Vincent and the Grenadines has been ahead every year.
Bolivia, Plurinational State of ranks 135th and Saint Vincent and the Grenadines ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Bolivia, Plurinational State of or Saint Vincent and the Grenadines?
- Bolivia, Plurinational State of, at 2 DB16-20 methodology against 2 DB16-20 methodology in Saint Vincent and the Grenadines as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Bolivia, Plurinational State of and Saint Vincent and the Grenadines?
- 0 DB16-20 methodology, with Bolivia, Plurinational State of ahead.
- How many years of comparable data are there for Bolivia, Plurinational State of and Saint Vincent and the Grenadines?
- 6 years are reported by both, from 2014 to 2019.
- How do Bolivia, Plurinational State of and Saint Vincent and the Grenadines rank globally for dealing with construction permits: quality control after construction?
- Bolivia, Plurinational State of ranks 135th and Saint Vincent and the Grenadines ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.