Bosnia and Herzegovina vs Philippines: Dealing with construction permits: Quality control after construction
Bosnia and Herzegovina
3 DB16-20 methodology
in 2019
Philippines
3 DB16-20 methodology
in 2019
Bosnia and Herzegovina rank
1st
Philippines rank
1st
Dealing with construction permits: Quality control after construction over time
- Bosnia and Herzegovina
- Philippines
How they compare
Bosnia and Herzegovina currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Philippines, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Philippines has been ahead every year.
Bosnia and Herzegovina ranks 1st and Philippines ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Bosnia and Herzegovina or Philippines?
- Bosnia and Herzegovina, at 3 DB16-20 methodology against 3 DB16-20 methodology in Philippines as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Bosnia and Herzegovina and Philippines?
- 0 DB16-20 methodology, with Bosnia and Herzegovina ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Philippines?
- 6 years are reported by both, from 2014 to 2019.
- How do Bosnia and Herzegovina and Philippines rank globally for dealing with construction permits: quality control after construction?
- Bosnia and Herzegovina ranks 1st and Philippines ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.