Botswana vs China: Dealing with construction permits: Quality control after construction

Botswana
3 DB16-20 methodology
in 2019
China
3 DB16-20 methodology
in 2019
Botswana rank
1st
China rank
1st

Dealing with construction permits: Quality control after construction over time

  • Botswana
  • China
0123201420162019

How they compare

Botswana currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in China, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, China has been ahead every year.

Botswana ranks 1st and China ranks 1st of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Botswana or China?
Botswana, at 3 DB16-20 methodology against 3 DB16-20 methodology in China as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Botswana and China?
0 DB16-20 methodology, with Botswana ahead.
How many years of comparable data are there for Botswana and China?
6 years are reported by both, from 2014 to 2019.
How do Botswana and China rank globally for dealing with construction permits: quality control after construction?
Botswana ranks 1st and China ranks 1st of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.