Botswana vs Czechia: Dealing with construction permits: Quality control after construction
Botswana
3 DB16-20 methodology
in 2019
Czechia
3 DB16-20 methodology
in 2019
Botswana rank
1st
Czechia rank
1st
Dealing with construction permits: Quality control after construction over time
- Botswana
- Czechia
How they compare
Botswana currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Czechia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Czechia has been ahead every year.
Botswana ranks 1st and Czechia ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Botswana or Czechia?
- Botswana, at 3 DB16-20 methodology against 3 DB16-20 methodology in Czechia as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Botswana and Czechia?
- 0 DB16-20 methodology, with Botswana ahead.
- How many years of comparable data are there for Botswana and Czechia?
- 6 years are reported by both, from 2014 to 2019.
- How do Botswana and Czechia rank globally for dealing with construction permits: quality control after construction?
- Botswana ranks 1st and Czechia ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.