Botswana vs Kosovo (UNSCR 1244): Dealing with construction permits: Quality control after construction

Botswana
3 DB16-20 methodology
in 2019
Kosovo (UNSCR 1244)
3 DB16-20 methodology
in 2019
Botswana rank
1st
Kosovo (UNSCR 1244) rank
1st

Dealing with construction permits: Quality control after construction over time

  • Botswana
  • Kosovo (UNSCR 1244)
0123201420162019

How they compare

Botswana currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Kosovo (UNSCR 1244), a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Kosovo (UNSCR 1244) has been ahead every year.

Botswana ranks 1st and Kosovo (UNSCR 1244) ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Botswana or Kosovo (UNSCR 1244)?
Botswana, at 3 DB16-20 methodology against 3 DB16-20 methodology in Kosovo (UNSCR 1244) as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Botswana and Kosovo (UNSCR 1244)?
0 DB16-20 methodology, with Botswana ahead.
How many years of comparable data are there for Botswana and Kosovo (UNSCR 1244)?
6 years are reported by both, from 2014 to 2019.
How do Botswana and Kosovo (UNSCR 1244) rank globally for dealing with construction permits: quality control after construction?
Botswana ranks 1st and Kosovo (UNSCR 1244) ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Botswana vs Kosovo (UNSCR 1244): Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/botswana/kosovo-unscr-1244/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/botswana/kosovo-unscr-1244/">Botswana vs Kosovo (UNSCR 1244): Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.