Botswana vs Laos: Dealing with construction: Quality control after
Botswana
3 DB16-20 methodology
in 2019
Laos
3 DB16-20 methodology
in 2019
Botswana rank
1st
Laos rank
1st
Dealing with construction: Quality control after over time
- Botswana
- Laos
How they compare
Botswana currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Laos, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Laos has been ahead every year.
Botswana ranks 1st and Laos ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Botswana or Laos?
- Botswana, at 3 DB16-20 methodology against 3 DB16-20 methodology in Laos as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Botswana and Laos?
- 0 DB16-20 methodology, with Botswana ahead.
- How many years of comparable data are there for Botswana and Laos?
- 6 years are reported by both, from 2014 to 2019.
- How do Botswana and Laos rank globally for dealing with construction permits: quality control after construction?
- Botswana ranks 1st and Laos ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.