Brazil vs Comoros: Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- Brazil
- Comoros
How they compare
Brazil currently reports 2.39 DB16-20 methodology against 2 DB16-20 methodology in Comoros, a difference of 0.39 DB16-20 methodology.
That makes Brazil's figure about 1.2 times Comoros's.
Across all 6 years both countries report, Brazil has been ahead every year.
Brazil ranks 132nd and Comoros ranks 134th of 185 countries.
Brazil has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Brazil or Comoros?
- Brazil, at 2.39 DB16-20 methodology against 2 DB16-20 methodology in Comoros as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Brazil and Comoros?
- 0.39 DB16-20 methodology, with Brazil ahead.
- How many years of comparable data are there for Brazil and Comoros?
- 6 years are reported by both, from 2014 to 2019.
- How do Brazil and Comoros rank globally for dealing with construction permits: quality control after construction?
- Brazil ranks 132nd and Comoros ranks 134th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.