Brazil vs Comoros: Dealing with construction permits: Quality control after construction

Brazil
2.39 DB16-20 methodology
in 2019
Comoros
2 DB16-20 methodology
in 2019
Brazil rank
132nd
Comoros rank
134th

Dealing with construction permits: Quality control after construction over time

  • Brazil
  • Comoros
00.511.522.5201420162019

How they compare

Brazil currently reports 2.39 DB16-20 methodology against 2 DB16-20 methodology in Comoros, a difference of 0.39 DB16-20 methodology.

That makes Brazil's figure about 1.2 times Comoros's.

Across all 6 years both countries report, Brazil has been ahead every year.

Brazil ranks 132nd and Comoros ranks 134th of 185 countries.

Brazil has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Brazil or Comoros?
Brazil, at 2.39 DB16-20 methodology against 2 DB16-20 methodology in Comoros as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Brazil and Comoros?
0.39 DB16-20 methodology, with Brazil ahead.
How many years of comparable data are there for Brazil and Comoros?
6 years are reported by both, from 2014 to 2019.
How do Brazil and Comoros rank globally for dealing with construction permits: quality control after construction?
Brazil ranks 132nd and Comoros ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brazil vs Comoros: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/brazil/comoros/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/brazil/comoros/">Brazil vs Comoros: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.