Brazil vs Congo: Dealing with construction permits: Quality control after construction

Brazil
2.39 DB16-20 methodology
in 2019
Congo
2 DB16-20 methodology
in 2019
Brazil rank
130th
Congo rank
132nd

Dealing with construction permits: Quality control after construction over time

  • Brazil
  • Congo
00.511.522.5201420162019

How they compare

Brazil currently reports 2.39 DB16-20 methodology against 2 DB16-20 methodology in Congo, a difference of 0.39 DB16-20 methodology.

That makes Brazil's figure about 1.2 times Congo's.

Across all 6 years both countries report, Brazil has been ahead every year.

Brazil ranks 130th and Congo ranks 132nd of 183 countries.

Brazil has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Brazil or Congo?
Brazil, at 2.39 DB16-20 methodology against 2 DB16-20 methodology in Congo as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Brazil and Congo?
0.39 DB16-20 methodology, with Brazil ahead.
How many years of comparable data are there for Brazil and Congo?
6 years are reported by both, from 2014 to 2019.
How do Brazil and Congo rank globally for dealing with construction permits: quality control after construction?
Brazil ranks 130th and Congo ranks 132nd of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.