Brunei vs Turkey: Dealing with construction permits: Quality control after construction
Brunei
3 DB16-20 methodology
in 2019
Turkey
3 DB16-20 methodology
in 2019
Brunei rank
1st
Turkey rank
1st
Dealing with construction permits: Quality control after construction over time
- Brunei
- Turkey
How they compare
Brunei currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Turkey, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Turkey has been ahead every year.
Brunei ranks 1st and Turkey ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Brunei or Turkey?
- Brunei, at 3 DB16-20 methodology against 3 DB16-20 methodology in Turkey as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Brunei and Turkey?
- 0 DB16-20 methodology, with Brunei ahead.
- How many years of comparable data are there for Brunei and Turkey?
- 6 years are reported by both, from 2014 to 2019.
- How do Brunei and Turkey rank globally for dealing with construction permits: quality control after construction?
- Brunei ranks 1st and Turkey ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.