Brunei vs Venezuela: Dealing with construction permits: Quality control after construction

Brunei
3 DB16-20 methodology
in 2019
Venezuela
3 DB16-20 methodology
in 2019
Brunei rank
1st
Venezuela rank
1st

Dealing with construction permits: Quality control after construction over time

  • Brunei
  • Venezuela
0123201420162019

How they compare

Brunei currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Venezuela, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Venezuela has been ahead every year.

Brunei ranks 1st and Venezuela ranks 1st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Brunei or Venezuela?
Brunei, at 3 DB16-20 methodology against 3 DB16-20 methodology in Venezuela as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Brunei and Venezuela?
0 DB16-20 methodology, with Brunei ahead.
How many years of comparable data are there for Brunei and Venezuela?
6 years are reported by both, from 2014 to 2019.
How do Brunei and Venezuela rank globally for dealing with construction permits: quality control after construction?
Brunei ranks 1st and Venezuela ranks 1st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei vs Venezuela: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/brunei-darussalam/venezuela-rb/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/brunei-darussalam/venezuela-rb/">Brunei vs Venezuela: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.