Burkina Faso vs Italy: Dealing with construction permits: Quality control after construction
Burkina Faso
3 DB16-20 methodology
in 2019
Italy
3 DB16-20 methodology
in 2019
Burkina Faso rank
1st
Italy rank
1st
Dealing with construction permits: Quality control after construction over time
- Burkina Faso
- Italy
How they compare
Burkina Faso currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Italy, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Italy has been ahead every year.
Burkina Faso ranks 1st and Italy ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Burkina Faso or Italy?
- Burkina Faso, at 3 DB16-20 methodology against 3 DB16-20 methodology in Italy as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Burkina Faso and Italy?
- 0 DB16-20 methodology, with Burkina Faso ahead.
- How many years of comparable data are there for Burkina Faso and Italy?
- 6 years are reported by both, from 2014 to 2019.
- How do Burkina Faso and Italy rank globally for dealing with construction permits: quality control after construction?
- Burkina Faso ranks 1st and Italy ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.