Cabo Verde vs Qatar: Dealing with construction permits: Quality control after construction
Cabo Verde
3 DB16-20 methodology
in 2019
Qatar
3 DB16-20 methodology
in 2019
Cabo Verde rank
1st
Qatar rank
1st
Dealing with construction permits: Quality control after construction over time
- Cabo Verde
- Qatar
How they compare
Cabo Verde currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Qatar, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Qatar has been ahead every year.
Cabo Verde ranks 1st and Qatar ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Cabo Verde or Qatar?
- Cabo Verde, at 3 DB16-20 methodology against 3 DB16-20 methodology in Qatar as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Cabo Verde and Qatar?
- 0 DB16-20 methodology, with Cabo Verde ahead.
- How many years of comparable data are there for Cabo Verde and Qatar?
- 6 years are reported by both, from 2014 to 2019.
- How do Cabo Verde and Qatar rank globally for dealing with construction permits: quality control after construction?
- Cabo Verde ranks 1st and Qatar ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.