Cambodia vs Cote d'Ivoire: Dealing with construction permits: Quality control after construction
Cambodia
2 DB16-20 methodology
in 2019
Cote d'Ivoire
2 DB16-20 methodology
in 2019
Cambodia rank
135th
Cote d'Ivoire rank
135th
Dealing with construction permits: Quality control after construction over time
- Cambodia
- Cote d'Ivoire
How they compare
Cambodia currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Cote d'Ivoire, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Cote d'Ivoire has been ahead every year.
Cambodia ranks 135th and Cote d'Ivoire ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Cambodia or Cote d'Ivoire?
- Cambodia, at 2 DB16-20 methodology against 2 DB16-20 methodology in Cote d'Ivoire as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Cambodia and Cote d'Ivoire?
- 0 DB16-20 methodology, with Cambodia ahead.
- How many years of comparable data are there for Cambodia and Cote d'Ivoire?
- 6 years are reported by both, from 2014 to 2019.
- How do Cambodia and Cote d'Ivoire rank globally for dealing with construction permits: quality control after construction?
- Cambodia ranks 135th and Cote d'Ivoire ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.