Cameroon vs Germany: Dealing with construction: Quality control after
Cameroon
2 DB16-20 methodology
in 2019
Germany
2 DB16-20 methodology
in 2019
Cameroon rank
135th
Germany rank
135th
Dealing with construction: Quality control after over time
- Cameroon
- Germany
How they compare
Cameroon currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Germany, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Germany has been ahead every year.
Cameroon ranks 135th and Germany ranks 135th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Cameroon or Germany?
- Cameroon, at 2 DB16-20 methodology against 2 DB16-20 methodology in Germany as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Cameroon and Germany?
- 0 DB16-20 methodology, with Cameroon ahead.
- How many years of comparable data are there for Cameroon and Germany?
- 6 years are reported by both, from 2014 to 2019.
- How do Cameroon and Germany rank globally for dealing with construction permits: quality control after construction?
- Cameroon ranks 135th and Germany ranks 135th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.