Chad vs Thailand: Dealing with construction permits: Quality control after construction
Chad
3 DB16-20 methodology
in 2019
Thailand
3 DB16-20 methodology
in 2019
Chad rank
1st
Thailand rank
1st
Dealing with construction permits: Quality control after construction over time
- Chad
- Thailand
How they compare
Chad currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Thailand has been ahead every year.
Chad ranks 1st and Thailand ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, Chad or Thailand?
- Chad, at 3 DB16-20 methodology against 3 DB16-20 methodology in Thailand as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between Chad and Thailand?
- 0 DB16-20 methodology, with Chad ahead.
- How many years of comparable data are there for Chad and Thailand?
- 6 years are reported by both, from 2014 to 2019.
- How do Chad and Thailand rank globally for dealing with construction permits: quality control after construction?
- Chad ranks 1st and Thailand ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.