China (People’s Republic of) vs Iran (Islamic Republic of): Dealing with construction permits: Quality control after construction
Dealing with construction permits: Quality control after construction over time
- China (People’s Republic of)
- Iran (Islamic Republic of)
How they compare
China (People’s Republic of) currently reports 3 DB16-20 methodology against 3 DB16-20 methodology in Iran (Islamic Republic of), a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Iran (Islamic Republic of) has been ahead every year.
China (People’s Republic of) ranks 1st and Iran (Islamic Republic of) ranks 1st of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control after construction, China (People’s Republic of) or Iran (Islamic Republic of)?
- China (People’s Republic of), at 3 DB16-20 methodology against 3 DB16-20 methodology in Iran (Islamic Republic of) as of 2019.
- What is the difference in dealing with construction permits: quality control after construction between China (People’s Republic of) and Iran (Islamic Republic of)?
- 0 DB16-20 methodology, with China (People’s Republic of) ahead.
- How many years of comparable data are there for China (People’s Republic of) and Iran (Islamic Republic of)?
- 6 years are reported by both, from 2014 to 2019.
- How do China (People’s Republic of) and Iran (Islamic Republic of) rank globally for dealing with construction permits: quality control after construction?
- China (People’s Republic of) ranks 1st and Iran (Islamic Republic of) ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.