Comoros vs Democratic Republic of Congo: Dealing with construction permits: Quality control after construction

Comoros
2 DB16-20 methodology
in 2019
Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Comoros rank
132nd
Democratic Republic of Congo rank
132nd

Dealing with construction permits: Quality control after construction over time

  • Comoros
  • Democratic Republic of Congo
00.511.52201420162019

How they compare

Comoros currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of Congo, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Democratic Republic of Congo has been ahead every year.

Comoros ranks 132nd and Democratic Republic of Congo ranks 132nd of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Comoros or Democratic Republic of Congo?
Comoros, at 2 DB16-20 methodology against 2 DB16-20 methodology in Democratic Republic of Congo as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Comoros and Democratic Republic of Congo?
0 DB16-20 methodology, with Comoros ahead.
How many years of comparable data are there for Comoros and Democratic Republic of Congo?
6 years are reported by both, from 2014 to 2019.
How do Comoros and Democratic Republic of Congo rank globally for dealing with construction permits: quality control after construction?
Comoros ranks 132nd and Democratic Republic of Congo ranks 132nd of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.