Comoros, Union of the vs Ethiopia, The Federal Democratic Republic of: Dealing with construction permits: Quality control after construction

Comoros, Union of the
2 DB16-20 methodology
in 2019
Ethiopia, The Federal Democratic Republic of
2 DB16-20 methodology
in 2019
Comoros, Union of the rank
134th
Ethiopia, The Federal Democratic Republic of rank
134th

Dealing with construction permits: Quality control after construction over time

  • Comoros, Union of the
  • Ethiopia, The Federal Democratic Republic of
00.511.52201420162019

How they compare

Comoros, Union of the currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Ethiopia, The Federal Democratic Republic of, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Comoros, Union of the ahead.

Comoros, Union of the ranks 134th and Ethiopia, The Federal Democratic Republic of ranks 134th of 185 countries.

Comoros, Union of the has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Comoros, Union of the or Ethiopia, The Federal Democratic Republic of?
Comoros, Union of the, at 2 DB16-20 methodology against 2 DB16-20 methodology in Ethiopia, The Federal Democratic Republic of as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Comoros, Union of the and Ethiopia, The Federal Democratic Republic of?
0 DB16-20 methodology, with Comoros, Union of the ahead.
How many years of comparable data are there for Comoros, Union of the and Ethiopia, The Federal Democratic Republic of?
6 years are reported by both, from 2014 to 2019.
How do Comoros, Union of the and Ethiopia, The Federal Democratic Republic of rank globally for dealing with construction permits: quality control after construction?
Comoros, Union of the ranks 134th and Ethiopia, The Federal Democratic Republic of ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros, Union of the vs Ethiopia, The Federal Democratic Republic of: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/comoros/ethiopia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/comoros/ethiopia/">Comoros, Union of the vs Ethiopia, The Federal Democratic Republic of: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.