Comoros vs Mali: Dealing with construction permits: Quality control after construction

Comoros
2 DB16-20 methodology
in 2019
Mali
2 DB16-20 methodology
in 2019
Comoros rank
132nd
Mali rank
132nd

Dealing with construction permits: Quality control after construction over time

  • Comoros
  • Mali
00.511.52201420162019

How they compare

Comoros currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Mali, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Mali has been ahead every year.

Comoros ranks 132nd and Mali ranks 132nd of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control after construction, Comoros or Mali?
Comoros, at 2 DB16-20 methodology against 2 DB16-20 methodology in Mali as of 2019.
What is the difference in dealing with construction permits: quality control after construction between Comoros and Mali?
0 DB16-20 methodology, with Comoros ahead.
How many years of comparable data are there for Comoros and Mali?
6 years are reported by both, from 2014 to 2019.
How do Comoros and Mali rank globally for dealing with construction permits: quality control after construction?
Comoros ranks 132nd and Mali ranks 132nd of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros vs Mali: Dealing with construction permits: Quality control after construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/comoros/mali/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/comoros/mali/">Comoros vs Mali: Dealing with construction permits: Quality control after construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.